1000 sft Double Bedroom House Complete work – A2Z Construction

Planning your dream residence production has by no means been an clean venture. How lots building cloth will it take to build your property, you need to understand it at first actual.As nicely as you’ll have to decide the cost of every constructing material and then on the basis of that you’ll should calculate the quantity your private home creation calls for.

for watch detailed video about 1000 sft Double Bedroom House Complete work – A2Z Construction, see below. for getting daily updates follow our facebook page and click see first option in following button. if you interested this. give this post to your friends and relatives.for more videos, subscribe now:A2Z Construction

Building Material performs very vital role in House Construction. Thus we usually need to take care while deciding on the amount and exceptional of the building fabric.

General Details

Total Plot Area : one thousand Square Feet

Total Bedrooms : 2

Bathrooms : 2

Building Material Required for 1000 sqft House and It’s Cost.

In this article we’re exactly going to show you the way you do the equal. But earlier than we do that, lets clean the fundamentals first.

What is Building Material?

Building fabric are te things which might be used in the creation of a house. E.G. Cement, Steel, Sand, Aggregate, Bricks, Labour Rate, Vatrified Tiles, Ceremic Tiles, Granite. Kota Stone, Door body, Door, Window, Window Sliding, Water Tank, Painting & Wall Putty, Plumbing, Electrification, Excavation and Filling, Bhishty (Curing), Filling, Wire Cover, etc.

What is the price of Buidling Materials?

Different constructing materials value in another way. Cement is around Rs. 400 consistent with bag, Steel prices you forty five Rupees in line with kg. The overall sum of all of those cloth determines the entire price of residence.

Quantitiy, Rate and Cost of Building Materials

To build a a thousand sqft house, we want the following materials. Rate of them and total fee are referred to as well.

CEMENT- A bag of cement costs around 300 rupees. To build a house in one thousand sqft we want round 450 bags of cement to be able to fee us near 1,35000 rupees.

STEEL- Steel prices forty five rs/kg. We require round 2.Five metric ton (or 25 quintals) that expenses us 1,12000 rupees.

SAND- It charges 55 rs/cubic foot (cuft) and we require 2000 cuft of this. Thus it expenses us a complete amound of 1,20000.

AGREGATE- Costs us 22rs/cuft.We need 1500 cuft of this meaning it expenses us a total amount of 30,000 rs.

BRICKS: We need 20,000 Units of bricks. One brick’s price is 6 rupees that bureaucracy a total quantity of one,20000 rs.

LABOUR RATE: Avg charge of labour is 200 rs/sqft. It expenses us a complete quantity of 2 Lakh rupees.

VATRIFIED TILES: These titles are utilized in Bathroom. 35rs/sqft. 600 sqft vatrified tiles will price us round 21,000 rs.

CEREMIC TILES: RATE- 20rs/sqft. We want 300 sqft that expenses us a complete amount of 6000rs.

GRANITE: Rate-one hundred fifty/sqft. Quantity- 20sqft. Total price- 3000rs.

KOTA STONE: Rate-forty/sqft. Quantity- 250 sqft. Total value- 10000rs

DOOR FRAME: Rate-1800/unit. Quantity- eight devices. Total value- 14400rs
DOOR: Two Types:
i). Rate-3500/unit. Quantity- 5units . Total price- 17,500rs

ii). Rate-2500/unit. Quantity- 3units. Total value- 7,500rs

WINDOW GRILL- Rate-1800/grill. Quantity- four devices. Total fee- 72,00rs

SLIDING WINDOW- Rate-2500/unit. Quantity- 4 units. Total price- 10,000rs.

WATER TANK- Rate-6/muddle. Quantity- one thousand L. Total value- 6000rs

PAINTING & WALLPUTTY- Rate-12-15/sqft. Quantity- ____ . Total price- 60000rs

PLUMBING- price- 30,000 rs.

ELECTRIFICATION- fee- 50,000 rs.

EXCAVATION AND FILLING- value-30,000 rs.

BHISHTY (CURING)- Rate-two hundred/day. Quantity- 6 months. Total price- 42000rs

EXTRA ITEMS- cost- 50,000 rs.

+ TOTAL COST OF BUILDING- RS. 10,eighty five,a hundred

Advertisement