Add cost and convenience to any domestic via putting in a brand new toilet on an top floor. Setting the plumbing for a brand new toilet calls for you to attach deliver water pipes and drainpipes to present systems. Once the new plumbing is in region, you can upload fixtures and furnishings to complete the room.
for watch detailed video about how to build upstair bathroom, see below. for getting daily updates follow our facebook page and click see first option in following button. if you interested this. give this post to your friends and relatives.for more videos, subscribe now:ALL ROUND CONSTRUCTIONS
Connecting to Drain Lines
Step 1
Contact your neighborhood building branch to look whether a permit is wanted for adding new plumbing.
Step 2
Remove the drywall within the lavatory in opposition to a wall that has the closest access to the plumbing strains, if there’s no direct get admission to to plumbing inside an access panel inside the room. The drywall can be removed the usage of a reciprocating noticed and a drywall blade. Pull out the drywall in small sections and discard.
Step three
Locate a drain line within the wall.
Step four
Turn the principle water line ball valve ninety ranges clockwise to shut off the drift of water to the entire plumbing gadget. Open all the faucet taps inside the residence to drain as plenty water as feasible from the lines.
Step five
Cut out a five-inch phase of the waste line the usage of a hacksaw or pipe-slicing tool.
Step 6
Apply a layer of ABS cement to the internal of an ABS Y-coupler.
Step 7
Press the coupler into the hole that you reduce into the drain line until the suitable slips over each ends of the pipe. Make certain the hole on the Y-becoming is pointed toward the inner of the rest room to permit for smooth get entry to in a while. Allow the cement to set for 10 mins. Once dry, the Y-becoming will offer a gap to attach the sink and rest room drains.
Connecting Supply Lines
Step 1
Locate present hot and cold water lines inside the basement, crawlspace or get entry to panel closest to the rest room.
Step 2
Turn the ball valve on the main water line ninety stages clockwise to turn off the water to the house whilst you work.
Step 3
Mark a 5-inch section on each the recent and cold water lines.
Step four
Cut at the marks with a pipe-cutting device or hacksaw.
Step five
Clean the rims of the reduce pipes with a cloth to take away any plastic or copper shavings.
Step 6
Place push-to-match T-fittings into one side of every of the deliver lines, with the third establishing dealing with the path of the rest room. The fitting will audibly snap into vicinity.
Step 7
Gently pull lower back on the fittings and the alternative side of the cut pipe to slip the pipes into the alternative side of the fittings. Release the best and the pipe to finish the connection.
Step 8
Thread the new water pipes into the wall in the course of the rest room and insert the base of the pipes into the openings on the T-fittings. This will join the water traces to the present plumbing system.
Step nine
Have a helper guide the tops of the pipes into the outlet inside the upstairs toilet wall. Temporarily relaxed the tops of the pipes towards a stud within the wall via placing a pipe strap around each line and tapping the provided nails into the studs. This will maintain the strains in place until you are equipped to feature fixtures and person fixtures.